Home     Site Map     हिन्दी

Government of India
Ministry of Power
Central Electricity Authority
North Eastern Regional Power Committee

 

भारत सरकार
विद्युत मंत्रालय
केन्द्रीय विद्युत प्राधिकरण
उत्तर पूर्वी क्षेत्रीय विद्युत समिति

NERPC - logo
  • Banner
  • Banner
  • Banner
  • Banner
  • Banner
HOME
Official Language Policy
Install Capacity of NER
Right to Information Act
Power Map of NER
CERC Orders
CERC Regulations
CEA Regulations
ECI NVSP
Archieves
Tenders
Photo Gallery
Independence Day
Swacch Bharat Pakhwada
International Yoga Day
Vigilance Awareness
Constitution Day
Republic Day
Contact Us
Feedback
Site Map

Nature

Introduction
In accordance with the Electricity Act, 2003, RPCs have been constituted by the Central Government for the specified Region(s) for facilitating the Integrated operation of the power system in the Region. The Secretariat of the RPC is headed by the Member Secretary, who is appointed by the Central Electricity Authority (CEA), together with the other staff for the RPC Secretariat. Under section 29(4) of the Electricity Act, 2003, the Regional Power Committee in the region may, from time to time, agree on matters concerning the stability and smooth operation of the integrated grid and economy and efficiency in the operation of the power system in that region.         The following functions which go to facilitate the stability and smooth operation of the systems are identified for the RPC:
  1. To undertake Regional Level operation analysis for improving grid performance.
  2. To facilitate inter-state/inter-regional transfer of power.
  3. To facilitate all functions of planning relating to inter-state/ intrastate transmission system with CTU/STU.
  4. To coordinate planning of maintenance of generating machines of various generating companies of the region including those of interstate generating companies supplying electricity to the Region on annual basis and also to undertake review of maintenance programmed on monthly basis.
  5. To undertake planning of outage of transmission system on annual / monthly basis.
  6. To undertake operational planning studies including protection studies for stable operation of the grid.
  7. To undertake planning for maintaining proper voltages through review of reactive compensation requirement through system study committee and monitoring of installed capacitors.
  8. To evolve consensus on all issues relating to economy and efficiency in the operation of power system in the region.
The decisions of RPC arrived at by consensus regarding operation of the regional grid and scheduling and despatch of electricity, if not inconsistent with the provisions of IEGC / CERC Regulations, shall be followed by the concerned RLDC/SLDC/CTU/STU and Users, subject to directions of the Central Commission, if any. Member Secretary, RPC shall, certify transmission system availability factor for regional AC and HVDC transmission systems separately for the purpose of payment of transmission charges: RPC Secretariat or any other person as notified by the Commission from time to time, shall prepare monthly Regional Energy Account (REA), weekly unscheduled interchange account, reactive energy account, and congestion charge account, based on data provided by RLDC, and renewable regulatory charge account based on data provided by SLDC/RLDC of the State/Region in which the wind generator is located and any other charges specified by the Commission for the purpose of billing and payments of various charges .

Meetings

Intimation of Meeting Date & Venue for 36th Commercial Co-ordination Committee Meeting of NERPC Isuued


Agenda for 10th NETeST Meeting of NERPC Isuued


Agenda for 146th OCC Meeting of NERPC Isuued


Meeting Notice & Inviting Agenda for 36th Commercial Co-ordination Committee Meeting of NERPC Isuued


Meeting Notice & Inviting Agenda for 10th NETeST &146th OCC Meetings of NERPC Isuued


Meeting Notice & Inviting Agenda for 19th TCC &19th NERPC Meetings of NERPC Isuued


Minutes for 145th OCC Meeting Isuued


Latest Energy Accounts

Reactive Accounts for the period from 02.07.18 to 08.07.18 issued


RRAS Account Statement for the week from 02.07.2018 to 08.07.2018 issued


RRAS Account Data for the week from 02.07.2018 to 08.07.2018 issued


Deviation Settlement Account Data for the week from 02.07.2018 to 08.07.2018 issued


Deviation Settlement Account Statement for the week from 02.07.2018 to 08.07.2018 issued


Corrigendum to Bilateral Exchanges for the month of May 2018 issued


Corrigendum to Revised Bilateral Exchanges for the month of April 2018 issued


RTA for the month of June 2018 issued


Reactive Accounts for the period from 11.06.18 to 17.06.18 issued


Reactive Accounts for the period from 04.06.18 to 10.06.18 issued


REA for the month of June 2018 issued


Addendum to revised REA for the month of May 2018 issued


Bilateral Exchanges for the month of May 2018 issued


General

Notification of Chairman TCC


Wt. Average Share Allocation as on 31.05.2018


Notification of Chairman NERPC


LGBR 2018-19 for North-Eastern Region


Notification of TCC Chairperson of NERPC


Click here to download the format for submitting protection details (with typical example) in excel